AxolotlMuseum

How Did We Get Here: Rails across the End

prop, abi and Suresh built an 800-block bridge and rail line from an End city to the gateway.

Event ASMP S1 19 Nov 2021

On 19 November 2021, prop, abi and Suresh set out to connect an End city to the gateway. prop posted the city’s coordinates, 1350, 70, -561 in the End 1, and the project grew into a bridge and rail line roughly 800 blocks long.

The clever part was the way to travel it: a boat in a minecart, which let a rider go on indefinitely. The crew captured shulkers along the way and tested the line, with prop narrating the setup (“on the minecart”) 2 and then confirming arrival with a single word, “there” 3. abi followed along in the chat 4.

  1. ProPlayerPlayz · 19 Nov 2021 · #the-original-mc-chat [name:ende city, x:1350, y:70, z:-561, dim:minecraft:the_end]
  2. prop · 19 Nov 2021 · #the-original-mc-chat on the minecart
  3. ProPlayerPlayz · 19 Nov 2021 · #the-original-mc-chat there
  4. abishekishere · 19 Nov 2021 · #the-original-mc-chat paravalaya XD